TabCalendar Changelog
Last updated: February 23, 2026 (America/Los_Angeles)
Applies to version/build: TabCalendar Production (controlled access) docs baseline (updated February 19, 2026; see changelog)
Small updates, explicit boundaries.
Boundaries
- This changelog tracks public docs and operator-facing boundary notes.
- It is not a roadmap.
Support intake checklist
If you’re reporting a regression or docs mismatch to support, include:
- Portal ID
- Record URL(s) and the surface you were in (record tab vs fullscreen)
- What you expected vs what happened
- Timestamp with timezone
2026-02-23 - Docs copy revamp (operator-first, boundary-first)
Changed
- Rewrote TabCalendar docs to match CleverCat voice, with clearer “does / does not” boundaries.
- Softened or removed claims that weren’t directly verifiable.
- Clarified that ICS subscription feeds are optional and may be disabled by default.
2026-02-22 - Fullscreen parity and scope correction docs refresh
Changed
- Docs now describe the shipped operator path: HubSpot record tab launches a hosted fullscreen calendar at
/calendar/fullscreen. - Documented multi-view modes (
Year / Month / Week / Day), filters/search, and the dark/light theme toggle as operator-visible fullscreen behavior. - Added docs coverage for read-only ICS subscription feeds and multi-artist watch-list boundaries.
- Published dedicated pricing route at
/apps/tabcalendar/pricingand updated docs links to point at the pricing tab. - Corrected HubSpot scope documentation: replaced invalid
crm.objects.notes.*scopes with contacts scopes used for notes/engagement authorization. - Expanded troubleshooting guidance for HubSpot user-session auth redirects/errors when feature-gated in a portal.
2026-02-19 - Production (controlled access) posture copy update
Changed
- Public copy now reflects TabCalendar as Production (controlled access).
- Preview/Early Access wording was removed across app, docs, and rollout-facing pages.
- Existing functional boundaries remain explicit (workflow action deferred, Google integration import-focused).
2026-02-17 - Public docs and route launch
Added
- TabCalendar app route at
/apps/tabcalendar. - Docs hub at
/apps/tabcalendar/docs. - Setup guide at
/apps/tabcalendar/docs/setup. - Known limitations page at
/apps/tabcalendar/docs/limitations. - Scopes and permissions page at
/apps/tabcalendar/docs/scopes. - Changelog page at
/apps/tabcalendar/docs/changelog. - Primary runtime CTA pointing to
https://calendar.clevercat.app.
Changed
- Shared app catalog and navigation surfaces now include TabCalendar as the third app.
- Public copy defined initial workflow-action and Google-sync boundaries.